Project Feature
The Cruden properties located near the coastal fringes required substantial repairs to the structural steel prior to the installation of the structural boarding.
Andrew Shepherd Construction has invested heavily in training for these systems and is a BBA accredited and Green Deal/ECO approved installer of both internal and external wall insulation systems to PAS2030.
Upgrading of 304 of 'Cruden' House types (i.e. concrete panelled houses tied to steel structure) throughout Aberdeenshire over a 3 years period by: (a) the installation of a structural EWI and rendered panel system to the external walls of the houses, with (b) concrete repairs to the column bases of the steel frame, and (c) various associated works; replacement, window/door flashings, partial replacement external doors and windows, rain water goods in occupied homes.
Client:
Aberdeenshire Council
Designer:
Aberdeenshire Council
Quantity Surveyor:
Aberdeenshire Council
Structural Engineer:
Fairhurst
Value:
£6,087,493
Duration:
2010 - 2013